Find what is holding a line back
One question across the MES, the maintenance system and the ERP: what is down, what work is open, and which part nobody has ordered.
- Team
- Operations
- Typed by
- Production manager
- Works with
- MES (PostgreSQL), CMMS (MySQL), ERP (SQL Server)
- Delivers
- An answer with the evidence, system by system
The request, as typed
Why is line 3's scrap up this week? Check the stops and alarms in the MES, the maintenance work and the spare parts it waits for, and the purchase order for them.

What it did.
Nothing to approve: every connector it used was read-only.
- 1
Queried the MES for the line's areas, equipment status and the week's alarms.
- 2
Queried the maintenance system for open work orders on that equipment and the spare parts they need.
- 3
Looked up the purchase orders for those parts in the ERP.
- 4
Joined the three by equipment tag, part and material number.
What came back.
Line 3 is running degraded: two conveyors in maintenance, a robot and a conveyor stopped, and a seal leak, an overcurrent and an emergency stop among the week's alarms. Work order WO-26-0068 waits for a gearbox that is below minimum stock with no open purchase order, so nobody has ordered it. It said plainly that the MES holds no scrap figure to compare week on week, so its conclusion rests on the stops, the alarms and the parts.
Every screen is a capture of seib Cowork 0.2.5 running the request shown with seib-1, the real model, with no step scripted. The systems and documents are seib’s test environment: two fictional companies, Nordhafen Components (a machine-building plant) and the Brennholt Group (a six-company group), with generated data. Where a folder carries project instructions, such as the names of a database’s tables, the run used them, as a customer’s would. Names, keys and file paths of the machine that ran it are masked; nothing else on a screen is changed. No customer data appears.
More use cases.
All 9- Trace a supplier's delay to the machineA delay mail followed through the ERP, the maintenance system and the MES — and a reply not written when the data said it would be wrong.
- Chase overdue purchase orders, every MondayThe overdue orders from the ERP in plain words, the three suppliers to call first, and the request saved to run itself each week.
- Explain a budget overrun from the journalBudget against actual for one cost centre and account, month by month, and the journal lines behind every overrun.
Request pilot access.
Not a waitlist. Tell us the problem and we’ll tell you honestly whether seib is ready for it.
- 1A person reads your request and replies within a few business days.
- 2A short call about the line, the toolchain and what's slow today.
- 3A Cowork pilot starts with one team, read-only connectors and two or three knowledge bases.